BIM Coordination & Clash Detection Services

MAX 360’s BIM Coordination and Clash Detection services enable Design & Construction teams to identify and solve potential issues prior to construction by virtually coordinating all trades, systems and components of a building.

By identifying and solving clashes of building elements during the preconstruction phase, construction teams are able to reduce construction rework, eliminate material waste, stay on schedule and avoid cost overruns.

Embrace the Digital Transformation and Stay Competitive

The Future of the AEC Industry is Built on BIM.

 

Get Started

Trades

Disciplines

Architectural

Structural

MEP

Benefits

Benefits of BIM Coordination

Streamline Field Operations

Eliminate Construction Rework

Minimize Errors

Reduce Construction Waste

Avoid Cost Overruns

Eliminate Schedule Delays

Get Started

Headquarters

177 E Colorado Blvd. Suite 200

Pasadena, CA 91105

Contact

+1 (626) 360-3585

info@max360.co